BFT P125002

BFT SB-BAT P125002 24V DC Battery Backup Kit Instruction Manual

For BFT Gate Opener Systems

1. Nhanganyaya

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2. Chigadzirwa Pamusoroview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

Mufananidzo 1: Kupfuuraview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1. Kit Zvikamu

Individual components of the BFT SB-BAT P125002 Battery Backup Kit

Mufananidzo 2: Detailed view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3. Kugarisana

This battery backup system is compatible with the following BFT gate operator series:

Ensure your gate operator model is listed above for proper functionality.

4. Setup uye Kuiswa

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. Chengetedzo Yekuchengetedza

4.2. Kuisa Matanho (Nhungamiro Yese)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. Isa Mabhatiri: Place the two 12V 1.2Ah batteries into the battery holder.
  3. Batanidza Mabhatiri: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. Secure Wiring: Route and secure all wiring to prevent pinching or damage.
  6. Dzosera Simba: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. Test System: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. Operating Instructions

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2. Simba Outage Operation (Power Off)

Pakaitika simba outage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. Kuchengeta

Regular maintenance ensures the longevity and reliability of your battery backup system.

6.1. Kuchajazve Mabhatiri

After a power utage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12 kusvika maawa 14. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

Iyo sisitimu inosanganisira a 20A fuse for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. Hupenyu hweBhatiri uye Kutsiva

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7. Kugadzirisa matambudziko

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

For persistent issues, contact BFT technical support or a qualified service technician.

8. Zvinotsanangurwa

FeatureTsanangudzo
Model NumberP125002
Bhatiri TypeYakavharwa Lead-Acid
Battery Capacity2x (12V 1.2Ah)
Kubuditsa Voltage24V DC (zita repamusoro)
Charge Voltage27.2V
Charge Current130mA
Battery Recharging Time12-14 maawa
Exhausted Battery Protection Threshold20.4V
Fiyuzi Chiyero20A
Operating TemperatureData detected with external temperature of: 25°C (77°F)

9. Warranty uye Tsigiro

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT webwebhusaiti yeruzivo rwemazuva ano rwekuonana nevanhu uye zviwanikwa zverutsigiro.